Construction has officially resumed on Wuhan's first loop line after a pause due to the coronavirus outbreak. The construction site of Jiangchu Road Station, one of the 37 stations along Line 12, sprang back to life as rotary drilling rigs bit into the earth. The total length of Line 12 is around 60 kilometers. The project is expected to be completed in 2024.
Copyright © 2020 CGTN. Beijing ICP prepared NO.16065310-3