Download
Beijing-Xiongan intercity railway starts full-line operations
Updated 21:35, 27-Dec-2020
The Beijing-Xiongan intercity railway opened on Sunday morning, at a designed maximum speed of 300 km per hour. /VCG

The Beijing-Xiongan intercity railway opened on Sunday morning, at a designed maximum speed of 300 km per hour. /VCG

It marks the full-line operation of the intercity railway, a key project for the coordinated development of the Beijing-Tianjin-Hebei region. /VCG

It marks the full-line operation of the intercity railway, a key project for the coordinated development of the Beijing-Tianjin-Hebei region. /VCG

The newly opened section, a stretch of 59 kilometers, has four stops and will cut the journey time between the two points to 19 minutes. /VCG

The newly opened section, a stretch of 59 kilometers, has four stops and will cut the journey time between the two points to 19 minutes. /VCG

The complete line is 91 kilometers long. /VCG

The complete line is 91 kilometers long. /VCG

Trains on the railway line will run at a designed maximum speed of 300 km per hour. /VCG

Trains on the railway line will run at a designed maximum speed of 300 km per hour. /VCG

Trains on the railway line will run at a designed maximum speed of 300 km per hour. /VCG

Trains on the railway line will run at a designed maximum speed of 300 km per hour. /VCG

The section from Beijing West Railway Station to the Daxing airport was put into use in September 2019. /VCG

The section from Beijing West Railway Station to the Daxing airport was put into use in September 2019. /VCG

Search Trends