The last power-generating unit of the Baihetan Hydropower Station in southwest China passed its 72-hour trial run and started operation officially on Thursday, signaling full operation of the eight units on the left bank of the project.
Copyright © 2020 CGTN. Beijing ICP prepared NO.16065310-3