2022.09.22 22:48 GMT+8

All generating units on left bank of Baihetan go into operation

Updated 2022.09.22 22:48 GMT+8
CGTN

The last power-generating unit of the Baihetan Hydropower Station in southwest China passed its 72-hour trial run and started operation officially on Thursday, signaling full operation of the eight units on the left bank of the project.

Copyright © 

RELATED STORIES