Download
Main cable strands on Lingdingyang Bridge completed in S China

Translating...

Content is automatically generated by Microsoft Azure Translator Text API. CGTN is not responsible for any of the translations.

Error loading player: No playable sources found
00:58

Lingdingyang Bridge is one of the key projects of the Shenzhen-Zhongshan highway link. All the strands of two main cables on the bridge were successfully set up. Each main cable consists of 199 strands, each made from 2060MPa grade high-strength cable steel wires. The total length of the Shenzhen-Zhongshan highway link is 24 kilometers, including an underwater tunnel and two artificial islands. The link will open to traffic in 2024, cutting commuting between the two cities from two hours to 30 minutes.

TOP NEWS
Xi: China, Cambodia a model of equality, trust, cooperation
{"type":2,"value":"CGTN","commentator":[],"valueShow":true,"commentatorShow":false}

Politics

09:03, 17-Apr-2025

China's industrial sector off to a strong start in Q1 2025
{"type":2,"value":"CGTN","commentator":[],"valueShow":true,"commentatorShow":false}

Economy

06:37, 18-Apr-2025

5th CICPE sees 92 billion yuan in intended deals
{"type":2,"value":"CGTN","commentator":[],"valueShow":true,"commentatorShow":false}

China

10:04, 18-Apr-2025

Search Trends