Download
Last standard immersed tube of Shenzhen-Zhongshan Bridge installed

Translating...

Content is automatically generated by Microsoft Azure Translator Text API. CGTN is not responsible for any of the translations.

Error loading player: No playable sources found
00:41

The installation of the last standard immersed tube of the Shenzhen-Zhongshan Bridge was completed in south China's Guangdong Province on October 21. The 24-kilometer-long Shenzhen-Zhongshan Bridge is a major national project that includes a 5,035-meter-long immersed tunnel made up of 32 immersed tubes and one final joint. The Shenzhen-Zhongshan Bridge is a super sea-crossing project integrating bridges, islands, tunnels, and underwater channels. It is expected to open to traffic in 2024. It will cut the commuting time between the two cities from two hours to 20 minutes.

MORE FROM CGTN

{"type":2,"value":"CGTN","commentator":[],"valueShow":true,"commentatorShow":false}

Video

11:23, 25-Mar-2025

{"type":2,"value":"CGTN","commentator":[],"valueShow":true,"commentatorShow":false}

Video

10:19, 25-Mar-2025

{"type":2,"value":"CGTN","commentator":[],"valueShow":true,"commentatorShow":false}

Video

10:18, 25-Mar-2025

{"type":2,"value":"CGTN","commentator":[],"valueShow":true,"commentatorShow":false}

Video

10:17, 25-Mar-2025

TOP NEWS

Asia's economy to grow 4.5% in 2025: Boao Forum for Asia report
{"type":2,"value":"CGTN","commentator":[],"valueShow":true,"commentatorShow":false}

Economy

07:13, 25-Mar-2025

Global investors confident in Chinese assets
{"type":2,"value":"CGTN","commentator":[],"valueShow":true,"commentatorShow":false}

Markets

10:09, 25-Mar-2025

U.S., Russia wrap up talks on proposed Black Sea ceasefire
{"type":2,"value":"CGTN","commentator":[],"valueShow":true,"commentatorShow":false}

World

23:40, 24-Mar-2025

Search Trends