Download
Hong Kong's Tseung Kwan O Cross Bay Bridge opens to traffic
CGTN

Translating...

Content is automatically generated by Microsoft Azure Translator Text API. CGTN is not responsible for any of the translations.

An aerial photo shows the Tseung Kwan O Cross Bay Bridge in Hong Kong, south China, December 8, 2022. /Xinhua
An aerial photo shows the Tseung Kwan O Cross Bay Bridge in Hong Kong, south China, December 8, 2022. /Xinhua

An aerial photo shows the Tseung Kwan O Cross Bay Bridge in Hong Kong, south China, December 8, 2022. /Xinhua

Hong Kong's Tseung Kwan O Cross Bay Bridge opened to traffic on December 11, becoming the first major bridge built exclusively by a mainland company in Hong Kong.

As an important cross-sea corridor at Junk Bay in the southeastern New Territories of Hong Kong, the Tseung Kwan O Cross Bay Bridge, the main project of the Cross Bay Link, was built by the China Road and Bridge Corp., which took over four years.

John Lee, chief executive of China's Hong Kong Special Administrative Region (HKSAR), said on December 10 at the commissioning ceremony of the Tseung Kwan O-Lam Tin Tunnel and the Cross Bay Link that the HKSAR government will stick to an infrastructure-led approach by rolling out more transport projects and improving existing networks and will release a blueprint by the end of next year.

The Cross Bay Link in Tseung Kwan O is about 1.8 kilometers long, of which one kilometer is a marine viaduct, and the steel bridge is an integral part of the marine viaduct.

People visit the Tseung Kwan O Cross Bay Bridge in Hong Kong, south China, December 11, 2022. /CFP
People visit the Tseung Kwan O Cross Bay Bridge in Hong Kong, south China, December 11, 2022. /CFP

People visit the Tseung Kwan O Cross Bay Bridge in Hong Kong, south China, December 11, 2022. /CFP

According to the China Road and Bridge Corp., the bridge is the longest span and heaviest steel arch bridge in Hong Kong.

The steel bridge components were prefabricated in the mainland, and the about 200-meter-long bridge was delivered to Hong Kong from Nantong, eastern Jiangsu Province.

This is the first time that the "float-over method" has been used in bridge erection in China. The project team also considered the tidal conditions for the erection.

The bridge project adopted off-site fabrication and assembly, whole bridge delivery and on-site installation. Using high-strength S690 steel for the arches of the bridge also represented a breakthrough in construction.

The bridge is the first marine viaduct in Hong Kong with a carriageway, a footpath, a cycle track and viewing platforms at the same time.

Source(s): Xinhua News Agency

MORE FROM CGTN

Innovative Hainan: Advancing AI for sustainability and innovation
{"type":2,"value":"CGTN","commentator":[],"valueShow":true,"commentatorShow":false}

Technology

00:03, 22-Mar-2025

China to clean up illegitimate charges to boost business environment
{"type":2,"value":"CGTN","commentator":[],"valueShow":true,"commentatorShow":false}

China

15:05, 21-Mar-2025

{"type":2,"value":"CGTN","commentator":[],"valueShow":true,"commentatorShow":false}

Space

14:58, 21-Mar-2025

Chang'e-6 samples date moon's oldest impact crater to 4.25b years ago
{"type":2,"value":"CGTN","commentator":[],"valueShow":true,"commentatorShow":false}

Space

14:57, 21-Mar-2025

TOP NEWS

China advances high-quality rural development based on local condition
{"type":2,"value":"CGTN","commentator":[],"valueShow":true,"commentatorShow":false}

Politics

15:13, 20-Mar-2025

Boao Forum for Asia to convene 2025 conference
{"type":2,"value":"CGTN","commentator":[],"valueShow":true,"commentatorShow":false}

China

10:49, 21-Mar-2025

Trump signs executive order to start dismantling Education Department
{"type":2,"value":"CGTN","commentator":[],"valueShow":true,"commentatorShow":false}

North America

01:09, 21-Mar-2025

Search Trends