2023.12.22 21:41 GMT+8

1-million-kilowatt-level wind, solar demonstration project connected to grid in NW China

Updated 2023.12.22 21:41 GMT+8
CGTN

A 1-million-kilowatt-level wind and solar demonstration project at the Huaneng Longdong Energy Base was connected to the power grid on December 21. The project has an installed capacity of 760,000 kilowatts of wind power and 240,000 kilowatts of photovoltaic power. It can produce 2.271 billion kilowatt-hours of green electricity annually, which can meet the annual electricity power consumption of nearly 780,000 households.

Copyright © 

RELATED STORIES