The installation of Haikui No. 1, Asia's first cylindrical floating oil-gas production, storage and offloading (FPSO) facility, was completed at Liuhua Oilfield in the Pearl River Mouth Basin, South China Sea, on Wednesday.
Copyright © 2020 CGTN. Beijing ICP prepared NO.16065310-3