A third hard rock tunnel boring machine (TBM) is being moved towards the working face of the Yangtze River-Hanjiang River water diversion project. The TBM, "Jianghan pioneer," is the third of the 10 hard rock TBMs set to be used in the project.
Copyright © 2020 CGTN. Beijing ICP prepared NO.16065310-3