2026.06.29 19:44 GMT+8

HUNGARY'S PAKS NUCLEAR POWER PLANT: OUTPUT MUST BE LOWERED BY AN ADDITIONAL 40 MW EVEN WITH LOOSENED COOLING WATER TEMPERATURE REGULATION

Updated 2026.06.29 19:44 GMT+8
CGTN
Copyright © 

RELATED STORIES