2026.09.02 18:22 GMT+8

Aerial footage shows barrier lake near Gyirong Port fully drained

Updated 2026.09.02 18:22 GMT+8
CGTN

New aerial footage shows the barrier lake, that was formed by the powerful mudslide near the Gyirong port, fully drained. Local authorities said on September 1 that experts had assessed the lake's risk as controllable. Rescue teams continue to monitor water levels, river flow and slope stability as operations continue in the disaster-hit area.

Copyright © 

RELATED STORIES