2026.09.18 15:30 GMT+8

86,000-tonne bridge completes synchronized rotation in Chengdu

Updated 2026.09.18 15:30 GMT+8
CGTN

The Tianfu Furong Bridge's dual synchronized rotation has been completed. The two bridge sections weigh a total of 86,000 tonnes, each with a 116-meter span and 36.1-meter width. The bridge in Chengdu City, southwest China's Sichuan Province, crosses a high-speed railway and urban expressway. It is a key part of the Chengdu-Leshan highway expansion project.

Copyright © 

RELATED STORIES