Two and half hours per night for 11 nights – that’s how long it took to build Chenxiang Road station, the first subway station built on running lines in Shanghai, China. Since the operation of existing lines must not be affected, construction has to be done at night.
Copyright © 2018 CGTN. Beijing ICP prepared NO.16065310-3
Copyright © 2018 CGTN. Beijing ICP prepared NO.16065310-3